Request Materials
← Asset portfolio
Asset 07 · Urban Modules

Additional Wellness Module, Dostyk

The second point of the urban platform

Almaty, 2 Dostyk St

0.1418 ha · 297.1 m²Area
On requestInvestment guide
Investment in the assetIndicative structure
Additional Wellness Module, Dostyk
01

About the asset

The second urban module of the medical and wellness programme. A 0.1418 ha plot with a 297.1 m² building, located on Dostyk Street, one of Almaty’s central arteries.

02

Location

Connected to the region’s business centre via the Almaty — Konaev highway.

  • Konaev centre10 min
  • Almaty — Konaev highway600 m
  • Almaty, business centre1 hour
  • Coordinates43.2385, 76.9557
03

Development concept

The format mirrors the Mamyr module but with a smaller building area and a more central location. Together the two modules allow an operator to serve different parts of the city under one brand.

04

Market rationale

The central location produces a different visitor profile from the module in a residential district. Assessment of demand and positioning requires separate research.

05

Parameters

Plot area0.1418 ha
Building297.1 m²
Development typeMedical and wellness module
StageLand assembled
Potential GBAUnder preparation
CAPEXUnder preparation
GDVUnder preparation
Investment requiredOn request
Development horizonUnder preparation
06

Transaction structure

Potential models of participation, presented for discussion. None is an agreed arrangement; the final structure is subject to negotiation and due diligence.

Direct acquisition

The investor acquires the asset and develops it independently.

Operator partnership

Engagement of a specialist operator — hospitality, medical or logistics.

Development partnership

Landowner, developer and capital partner combine their capabilities in a single project.

07

Investment highlights

  • 01An address on one of Almaty’s central arteries.
  • 02An existing building of 297.1 m².
  • 03Complements the Mamyr module by covering a different part of the city.
  • 04A small ticket relative to the other assets in the portfolio.
08

Risk and due diligence

Final development parameters are subject to technical, legal, financial and market due diligence. Figures marked "Under preparation" have not yet been calculated and must not be relied upon as a basis for an investment decision. The delivery timeline of state development programmes in the region is a separate risk factor. Full documentation is provided during due diligence following execution of an NDA.
Interested in this asset?

Request the investment memorandum

We will send detailed materials on the asset and discuss a possible model of participation. Data room access opens after an NDA is signed.