Logistics Hub, Block 018
A multimodal freight site
Konaev, block 018
About the asset
The largest asset in the portfolio by area: 35.0083 ha divided into 16 plots. The site is formed around operating rail infrastructure and is intended for a freight terminal with warehouse and container components.
Location
Connected to the region’s business centre via the Almaty — Konaev highway.
- Konaev centre10 min
- Almaty — Konaev highway600 m
- Almaty, business centre1 hour
- Coordinates43.8564, 77.0442
Development concept
Division into 16 plots allows the territory to be developed in stages and individual blocks to be handed to different operators without fragmenting management of the site as a whole. The multimodal profile rests on the combination of a rail connection and road access to the Almaty highway.
Market rationale
One stated reason for siting the new city of Alatau was its position along the Middle Corridor, the emerging route between Europe and China. One of Alatau’s four districts is designated as an export-oriented industrial and logistics cluster. Specific freight volumes, tariffs and demand structure remain subject to market research.
Parameters
| Plot area | 35.0083 ha |
|---|---|
| Subdivision | 16 plots |
| Development type | Freight terminal, warehouse and container infrastructure |
| Stage | Land assembled; development concept in preparation |
| Investment guide | EUR 600–900M |
| Potential GBA | Under preparation |
| GDV | Under preparation |
| Investment required | Subject to due diligence |
| Development horizon | Under preparation |
Transaction structure
Potential models of participation, presented for discussion. None is an agreed arrangement; the final structure is subject to negotiation and due diligence.
EPC / EPC+F
A design-and-build contracting scheme, where required with financing arranged by the contractor.
Direct acquisition
The investor acquires the asset and develops it independently.
Operator partnership
Engagement of a specialist operator — hospitality, medical or logistics.
Phased investment
Capital is deployed in stages as project milestones are met.
Investment highlights
- 01Operating rail infrastructure within the site — established, not planned.
- 02Division into 16 plots allows sequential delivery and multiple operators.
- 03Located within the influence zone of Alatau’s industrial and logistics district.
- 04Compatible with the adjacent logistics corridor as a single transhipment node.
Risk and due diligence
Request the investment memorandum
We will send detailed materials on the asset and discuss a possible model of participation. Data room access opens after an NDA is signed.